The Venetian's bridge, bell tower and canal lit up at night on the Strip.

8 News Now

F1 construction heading into ‘final turn’ with Las Vegas Grand Prix less than two weeks away

Barrier work is still cutting Las Vegas Boulevard to one lane each way from midnight to noon through Friday, and a 10-day Koval closure from Harmon to Rochelle starts Saturday through race weekend. 8 News Now also notes the track takedown brings more closures through the end of December, so traffic does not snap back when the race ends.

TrafficPublished

Photo: M Sides / Pexels

This is a short, factual note on a cited article — not a reprint of the piece. Confirm details on the original page before you travel or make plans around it.

Outlet
8 News Now
Published
Topic
Traffic

Why it matters

Barrier work is still cutting Las Vegas Boulevard to one lane each way from midnight to noon through Friday, and a 10-day Koval closure from Harmon to Rochelle starts Saturday through race weekend. 8 News Now also notes the track takedown brings more closures through the end of December, so traffic does not snap back when the race ends.

Read the original on 8 News Now →

Source: 8 News Now: F1 construction final turn. Checked Nov 10, 2026, 5:10 PM PT.

← All news · Official race week updates